{"id":7831,"date":"2025-07-30T13:05:00","date_gmt":"2025-07-30T06:05:00","guid":{"rendered":"https:\/\/www.globenewswire.com\/news-release\/2025\/07\/30\/3123772\/0\/en\/94-MW-V%C4%81rme-solar-farm-in-Latvia-reaches-the-commercial-operation-date.html3123772"},"modified":"2025-07-30T13:12:46","modified_gmt":"2025-07-30T06:12:46","slug":"94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date","status":"publish","type":"post","link":"https:\/\/cryptoinsider.asia\/vi\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\/","title":{"rendered":"94 MW V\u0101rme solar farm in Latvia reaches the commercial operation date"},"content":{"rendered":"\n<p align=\"justify\">AB \u201cIgnitis grup\u0117\u201d (hereinafter \u2013 the Group) informs that V\u0101rme solar farm, controlled by its subsidiary UAB \u201cIgnitis renewables\u201d (hereinafter \u2013 Ignitis Renewables), has reached the commercial operation date (hereinafter \u2013 COD).<\/p>\n<p align=\"justify\">The project is located in the western part of Latvia, Kuld\u012bga municipality. Covering 110 hectares, the solar farm is equipped with 156 thousand solar panels with a total installed capacity of 94 MW. The project will be able to cover the electricity demand of more than 40 thousand households.<\/p>\n<p align=\"justify\">The total investments in the solar farm, including acquisition and construction, will amount up to EUR 66 million.<\/p>\n<p align=\"justify\">With V\u0101rme solar farm reaching COD, the Group\u2019s installed Green Capacities have increased to 1.8 GW (from 1.7 GW).<\/p>\n<p align=\"justify\">The Group reminds that its strategic priority is to increase its Green Capacities from 1.4 GW in 2024 to 4\u20135 GW by 2030. For further details, see the Group\u2019s strategy (<a href=\"https:\/\/www.globenewswire.com\/Tracker?data=o0Y4bYeJQ7a4EjGOB9HeaRhMy7GQQARcpkQHWyIULy6e_Z1PD9YUx7HSUFE6PIvdokzuCzYHrF6uS8ndoqAo74m0cV7jd00PC2gjo6-KHUY=\" rel=\"nofollow\" target=\"_blank\" title=\"link\">link<\/a>).<\/p>\n<p align=\"justify\">The information provided in this announcement does not affect the Group\u2019s Adjusted EBITDA and Investments guidance for 2025.<\/p>\n<p align=\"justify\">For additional information, please contact:<\/p>\n<p align=\"justify\"><b>Communication<br \/><\/b>Valdas Lopeta<br \/>+370 621 77993<br \/><a href=\"https:\/\/www.globenewswire.com\/Tracker?data=b3E9inm6yPqllWiAzf9-K8Kk_S7tCipPOoJf1lDJ9hcmSEniOz4eM3WjZOtSK1B7W1kBoIRACH70rrFXnSskl-OVmasj-BnbX5_j6tET6YBXG0k1FR5EtlBkbpeK0iTN\" rel=\"nofollow\" target=\"_blank\" title=\"valdas.lopeta@ignitis.lt\">valdas.lopeta@ignitis.lt<\/a><\/p>\n<p><img decoding=\"async\" alt src=\"https:\/\/ml-eu.globenewswire.com\/media\/OWU3OGY2NGUtNTA2MC00NGE4LTk4M2YtZTdhYmVjNDdkMzkyLTExMDE5NDUtMjAyNS0wNy0zMC1lbg==\/tiny\/Ignitis-grupe.png\" referrerpolicy=\"no-referrer-when-downgrade\">  <\/p>\n","protected":false},"excerpt":{"rendered":"<p> AB \u201cIgnitis grup\u0117\u201d (hereinafter \u2013 the Group) informs that V\u0101rme solar farm, controlled by its subsidiary UAB \u201cIgnitis renewables\u201d (hereinafter \u2013 Ignitis Renewables), has reached the commercial operation date (hereinafter \u2013 COD). The project is located in the western part of Latvia, Kuld\u012bga municipality. Covering 110 hectares, the solar farm is equipped with 156 thousand solar panels with a total installed capacity of 94 MW. The project will be able to cover the electricity demand of more than 40 thousand&#8230;<\/p>\n","protected":false},"author":1,"featured_media":7832,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_lmt_disableupdate":"","_lmt_disable":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[75,1406],"tags":[],"class_list":["post-7831","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","category-globenewswire"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>94 MW V\u0101rme solar farm in Latvia reaches the commercial operation date<\/title>\n<meta name=\"description\" content=\"AB \u201cIgnitis grup\u0117\u201d (hereinafter \u2013 the Group) informs that V\u0101rme solar farm, controlled by its subsidiary UAB \u201cIgnitis renewables\u201d (hereinafter \u2013 Ignitis Renewables), has reached the commercial operation date (hereinafter \u2013 COD). The project is located in the western part of Latvia, Kuld\u012bga municipality. Covering 110 hectares, the solar farm is equipped with 156 thousand solar panels with a total installed capacity of 94 MW. The project will be able to cover the electricity demand of more than 40 thousand...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"http:\/\/AB%20\u201cIgnitis%20grup\u0117\u201d%20(hereinafter%20\u2013%20the%20Group)%20informs%20that%20V\u0101rme%20solar%20farm,%20controlled%20by%20its%20subsidiary%20UAB%20\u201cIgnitis%20renewables\u201d%20(hereinafter%20\u2013%20Ignitis%20Renewables),%20has%20reached%20the%20commercial%20operation%20date%20(hereinafter%20\u2013%20COD).%20The%20project%20is%20located%20in%20the%20western%20part%20of%20Latvia,%20Kuld\u012bga%20municipality.%20Covering%20110%20hectares,%20the%20solar%20farm%20is%20equipped%20with%20156%20thousand%20solar%20panels%20with%20a%20total%20installed%20capacity%20of%2094%20MW.%20The%20project%20will%20be%20able%20to%20cover%20the%20electricity%20demand%20of%20more%20than%2040%20thousand...\" \/>\n<meta property=\"og:locale\" content=\"vi_VN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"94 MW V\u0101rme solar farm in Latvia reaches the commercial operation date\" \/>\n<meta property=\"og:description\" content=\"AB \u201cIgnitis grup\u0117\u201d (hereinafter \u2013 the Group) informs that V\u0101rme solar farm, controlled by its subsidiary UAB \u201cIgnitis renewables\u201d (hereinafter \u2013 Ignitis Renewables), has reached the commercial operation date (hereinafter \u2013 COD). The project is located in the western part of Latvia, Kuld\u012bga municipality. Covering 110 hectares, the solar farm is equipped with 156 thousand solar panels with a total installed capacity of 94 MW. The project will be able to cover the electricity demand of more than 40 thousand...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cryptoinsider.asia\/vi\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\/\" \/>\n<meta property=\"og:site_name\" content=\"Crypto Insider\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/yourcryptoinsider\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-30T06:05:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-30T06:12:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ml-eu.globenewswire.com\/media\/OWU3OGY2NGUtNTA2MC00NGE4LTk4M2YtZTdhYmVjNDdkMzkyLTExMDE5NDUtMjAyNS0wNy0zMC1lbg==\/tiny\/Ignitis-grupe.png\" \/>\n<meta name=\"author\" content=\"Crypto Insider\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0110\u01b0\u1ee3c vi\u1ebft b\u1edfi\" \/>\n\t<meta name=\"twitter:data1\" content=\"Crypto Insider\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u01af\u1edbc t\u00ednh th\u1eddi gian \u0111\u1ecdc\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 ph\u00fat\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\\\/\"},\"author\":{\"name\":\"Crypto Insider\",\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/#\\\/schema\\\/person\\\/e81ca31713268a414ddbed321d3383d6\"},\"headline\":\"94 MW V\u0101rme solar farm in Latvia reaches the commercial operation date\",\"datePublished\":\"2025-07-30T06:05:00+00:00\",\"dateModified\":\"2025-07-30T06:12:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\\\/\"},\"wordCount\":182,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cryptoinsider.asia\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date.gif\",\"articleSection\":[\"Business\",\"GlobeNewswire\"],\"inLanguage\":\"vi\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\\\/\",\"url\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\\\/\",\"name\":\"94 MW V\u0101rme solar farm in Latvia reaches the commercial operation date - Crypto Insider\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cryptoinsider.asia\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date.gif\",\"datePublished\":\"2025-07-30T06:05:00+00:00\",\"dateModified\":\"2025-07-30T06:12:46+00:00\",\"description\":\"Crypto and Blockchain News\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\\\/#breadcrumb\"},\"inLanguage\":\"vi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"vi\",\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cryptoinsider.asia\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date.gif\",\"contentUrl\":\"https:\\\/\\\/cryptoinsider.asia\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date.gif\",\"width\":1,\"height\":1},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/cryptoinsider.asia\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/cryptoinsider.asia\\\/category\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Business\",\"item\":\"https:\\\/\\\/cryptoinsider.asia\\\/category\\\/business\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"94 MW V\u0101rme solar farm in Latvia reaches the commercial operation date\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/#website\",\"url\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/\",\"name\":\"Crypto Insider\",\"description\":\"Crypto and Blockchain News\",\"publisher\":{\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"vi\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/#organization\",\"name\":\"Crypto Insider\",\"url\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"vi\",\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cryptoinsider.asia\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/Logo-crypto-insider.jpeg\",\"contentUrl\":\"https:\\\/\\\/cryptoinsider.asia\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/Logo-crypto-insider.jpeg\",\"width\":2048,\"height\":2048,\"caption\":\"Crypto Insider\"},\"image\":{\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/vi\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/yourcryptoinsider\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/vietnaminsider\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cryptoinsider.asia\\\/#\\\/schema\\\/person\\\/e81ca31713268a414ddbed321d3383d6\",\"name\":\"Crypto Insider\",\"description\":\"Tin t\u1ee9c v\u1ec1 Ti\u1ec1n \u0111i\u1ec7n t\u1eed v\u00e0 c\u00f4ng ngh\u1ec7 Blockchain\",\"sameAs\":[\"https:\\\/\\\/cryptoinsider.asia\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"94 MW V\u0101rme solar farm in Latvia reaches the commercial operation date","description":"AB \u201cIgnitis grup\u0117\u201d (hereinafter \u2013 the Group) informs that V\u0101rme solar farm, controlled by its subsidiary UAB \u201cIgnitis renewables\u201d (hereinafter \u2013 Ignitis Renewables), has reached the commercial operation date (hereinafter \u2013 COD). The project is located in the western part of Latvia, Kuld\u012bga municipality. Covering 110 hectares, the solar farm is equipped with 156 thousand solar panels with a total installed capacity of 94 MW. The project will be able to cover the electricity demand of more than 40 thousand...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"AB \u201cIgnitis grup\u0117\u201d (hereinafter \u2013 the Group) informs that V\u0101rme solar farm, controlled by its subsidiary UAB \u201cIgnitis renewables\u201d (hereinafter \u2013 Ignitis Renewables), has reached the commercial operation date (hereinafter \u2013 COD). The project is located in the western part of Latvia, Kuld\u012bga municipality. Covering 110 hectares, the solar farm is equipped with 156 thousand solar panels with a total installed capacity of 94 MW. The project will be able to cover the electricity demand of more than 40 thousand...","og_locale":"vi_VN","og_type":"article","og_title":"94 MW V\u0101rme solar farm in Latvia reaches the commercial operation date","og_description":"AB \u201cIgnitis grup\u0117\u201d (hereinafter \u2013 the Group) informs that V\u0101rme solar farm, controlled by its subsidiary UAB \u201cIgnitis renewables\u201d (hereinafter \u2013 Ignitis Renewables), has reached the commercial operation date (hereinafter \u2013 COD). The project is located in the western part of Latvia, Kuld\u012bga municipality. Covering 110 hectares, the solar farm is equipped with 156 thousand solar panels with a total installed capacity of 94 MW. The project will be able to cover the electricity demand of more than 40 thousand...","og_url":"https:\/\/cryptoinsider.asia\/vi\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\/","og_site_name":"Crypto Insider","article_publisher":"https:\/\/www.facebook.com\/yourcryptoinsider","article_published_time":"2025-07-30T06:05:00+00:00","article_modified_time":"2025-07-30T06:12:46+00:00","og_image":[{"url":"https:\/\/ml-eu.globenewswire.com\/media\/OWU3OGY2NGUtNTA2MC00NGE4LTk4M2YtZTdhYmVjNDdkMzkyLTExMDE5NDUtMjAyNS0wNy0zMC1lbg==\/tiny\/Ignitis-grupe.png","type":"","width":"","height":""}],"author":"Crypto Insider","twitter_card":"summary_large_image","twitter_misc":{"\u0110\u01b0\u1ee3c vi\u1ebft b\u1edfi":"Crypto Insider","\u01af\u1edbc t\u00ednh th\u1eddi gian \u0111\u1ecdc":"1 ph\u00fat"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cryptoinsider.asia\/vi\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\/#article","isPartOf":{"@id":"https:\/\/cryptoinsider.asia\/vi\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\/"},"author":{"name":"Crypto Insider","@id":"https:\/\/cryptoinsider.asia\/#\/schema\/person\/e81ca31713268a414ddbed321d3383d6"},"headline":"94 MW V\u0101rme solar farm in Latvia reaches the commercial operation date","datePublished":"2025-07-30T06:05:00+00:00","dateModified":"2025-07-30T06:12:46+00:00","mainEntityOfPage":{"@id":"https:\/\/cryptoinsider.asia\/vi\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\/"},"wordCount":182,"commentCount":0,"publisher":{"@id":"https:\/\/cryptoinsider.asia\/#organization"},"image":{"@id":"https:\/\/cryptoinsider.asia\/vi\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\/#primaryimage"},"thumbnailUrl":"https:\/\/cryptoinsider.asia\/wp-content\/uploads\/2025\/07\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date.gif","articleSection":["Business","GlobeNewswire"],"inLanguage":"vi","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/cryptoinsider.asia\/vi\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/cryptoinsider.asia\/vi\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\/","url":"https:\/\/cryptoinsider.asia\/vi\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\/","name":"94 MW V\u0101rme solar farm in Latvia reaches the commercial operation date - Crypto Insider","isPartOf":{"@id":"https:\/\/cryptoinsider.asia\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cryptoinsider.asia\/vi\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\/#primaryimage"},"image":{"@id":"https:\/\/cryptoinsider.asia\/vi\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\/#primaryimage"},"thumbnailUrl":"https:\/\/cryptoinsider.asia\/wp-content\/uploads\/2025\/07\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date.gif","datePublished":"2025-07-30T06:05:00+00:00","dateModified":"2025-07-30T06:12:46+00:00","description":"Crypto and Blockchain News","breadcrumb":{"@id":"https:\/\/cryptoinsider.asia\/vi\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\/#breadcrumb"},"inLanguage":"vi","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cryptoinsider.asia\/vi\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\/"]}]},{"@type":"ImageObject","inLanguage":"vi","@id":"https:\/\/cryptoinsider.asia\/vi\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\/#primaryimage","url":"https:\/\/cryptoinsider.asia\/wp-content\/uploads\/2025\/07\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date.gif","contentUrl":"https:\/\/cryptoinsider.asia\/wp-content\/uploads\/2025\/07\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date.gif","width":1,"height":1},{"@type":"BreadcrumbList","@id":"https:\/\/cryptoinsider.asia\/vi\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cryptoinsider.asia\/"},{"@type":"ListItem","position":2,"name":"News","item":"https:\/\/cryptoinsider.asia\/category\/news\/"},{"@type":"ListItem","position":3,"name":"Business","item":"https:\/\/cryptoinsider.asia\/category\/business\/"},{"@type":"ListItem","position":4,"name":"94 MW V\u0101rme solar farm in Latvia reaches the commercial operation date"}]},{"@type":"WebSite","@id":"https:\/\/cryptoinsider.asia\/vi\/#website","url":"https:\/\/cryptoinsider.asia\/vi\/","name":"Crypto Insider","description":"Crypto and Blockchain News","publisher":{"@id":"https:\/\/cryptoinsider.asia\/vi\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cryptoinsider.asia\/vi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"vi"},{"@type":"Organization","@id":"https:\/\/cryptoinsider.asia\/vi\/#organization","name":"Crypto Insider","url":"https:\/\/cryptoinsider.asia\/vi\/","logo":{"@type":"ImageObject","inLanguage":"vi","@id":"https:\/\/cryptoinsider.asia\/vi\/#\/schema\/logo\/image\/","url":"https:\/\/cryptoinsider.asia\/wp-content\/uploads\/2021\/11\/Logo-crypto-insider.jpeg","contentUrl":"https:\/\/cryptoinsider.asia\/wp-content\/uploads\/2021\/11\/Logo-crypto-insider.jpeg","width":2048,"height":2048,"caption":"Crypto Insider"},"image":{"@id":"https:\/\/cryptoinsider.asia\/vi\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/yourcryptoinsider","https:\/\/www.linkedin.com\/company\/vietnaminsider"]},{"@type":"Person","@id":"https:\/\/cryptoinsider.asia\/#\/schema\/person\/e81ca31713268a414ddbed321d3383d6","name":"Crypto Insider","description":"Tin t\u1ee9c v\u1ec1 Ti\u1ec1n \u0111i\u1ec7n t\u1eed v\u00e0 c\u00f4ng ngh\u1ec7 Blockchain","sameAs":["https:\/\/cryptoinsider.asia"]}]}},"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/cryptoinsider.asia\/wp-content\/uploads\/2025\/07\/94-mw-varme-solar-farm-in-latvia-reaches-the-commercial-operation-date.gif","jetpack-related-posts":[],"jetpack_likes_enabled":false,"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/cryptoinsider.asia\/vi\/wp-json\/wp\/v2\/posts\/7831","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cryptoinsider.asia\/vi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cryptoinsider.asia\/vi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cryptoinsider.asia\/vi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cryptoinsider.asia\/vi\/wp-json\/wp\/v2\/comments?post=7831"}],"version-history":[{"count":0,"href":"https:\/\/cryptoinsider.asia\/vi\/wp-json\/wp\/v2\/posts\/7831\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cryptoinsider.asia\/vi\/wp-json\/wp\/v2\/media\/7832"}],"wp:attachment":[{"href":"https:\/\/cryptoinsider.asia\/vi\/wp-json\/wp\/v2\/media?parent=7831"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cryptoinsider.asia\/vi\/wp-json\/wp\/v2\/categories?post=7831"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cryptoinsider.asia\/vi\/wp-json\/wp\/v2\/tags?post=7831"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}